What needs an electrician

Any hardwired charger, and any circuit sized above what an existing outlet already supports, needs a licensed electrician to confirm panel capacity and run the circuit. Plug-in chargers using an existing correctly rated outlet are the exception. Requirements vary by jurisdiction, so confirm scope and permit needs with your electrician and local authority before you buy.

  • Autel AC Lite Home 40A EV charger with green status ring and NEMA 14-50 plug lead

    Autel AC Lite Home 40A EV Charger

    Charging that works with the outlet you already have — plugs into an existing NEMA 14-50, no new circuit if yours already supports it.

    View product 
  • Autel AC Elite Home 50A EV charger wall unit with green status ring and J1772 connector

    Autel AC Elite Home 50A EV Charger

    Full 50A hardwired charging with CSA certification behind it — the panel most homes can support without an upgrade.

    View product 
  • Garvee 60 in. adjustable-height workbench with rubberwood top, two drawers and locking casters

    Garvee 60 in. Adjustable-Height Workbench

    A height-adjustable bench with four outlets, so the same bay handles bumper work and cable management without borrowing space from the car.

    View product 
  • Autel MaxiCharger 80A residential EV charger wall unit with green status ring, front view

    Autel MaxiCharger 80A 19.2kW EV Charger

    80A of continuous output for the household running two EVs or a large-battery truck — the fastest Level 2 charging we carry.

    View product 
  • POWISER VOLTX 3 ULTRA 12K portable power station on locking casters, front view with display and outlets

    POWISER VOLTX 3 ULTRA 12K Portable Backup

    12kW portable hybrid backup on locking casters — pure sine output, 10ms transfer, and solar, grid, or generator charging inputs.

    View product 
  • Husky 56 in. heavy-duty mobile workbench with 1 in. wood top and 56 in. pegboard, front view

    Husky 56 in. Mobile Workbench with Pegboard

    A 3,000 lb-capacity bench with 10 soft-close drawers, pegboard, and lockable upper cabinets — the heavy-duty tier for a bay that does real fabrication work.

    View product 

How this ships

The chargers and the workbench in the Essential and Complete tiers ship standard ground parcel — no freight appointment needed. In the Full Build, the Husky 56 in. workbench weighs 472.5 lb and ships freight (LTL), curbside only, so budget for help moving it into the garage. The MaxiCharger 80A ships parcel at approximately 20.3 lb. Battery shipments like the POWISER VOLTX 3 ULTRA 12K can carry lithium-battery handling restrictions; confirm exact shipping weight and method with us before you order.

Estimated timeline

A plug-in Essential install is typically same-day. A hardwired Complete or Full Build install runs 1-3 weeks out once you book an electrician, longer if a panel upgrade is needed — get an electrician's estimate before you order hardwired components. See the charger buying guide or head back to Build Your Garage for the rest of the project pages.